April 2025
Charlotte-Mecklenburg Storm Water Services and engineering consultant DPR Associates have completed the study of the existing storm drainage system in the Manor project area.
Next, the project will move into the design phase. During this phase the project team will develop detailed drawings for the proposed improvements.