April 2025
Charlotte-Mecklenburg Storm Water Services and engineering consultant Brown and Caldwell have completed the study of the existing storm drainage system in the Cricketeer project area.
Next, the project will move into the design phase. During this phase the project team will develop detailed drawings for the proposed improvements.