Jan. 17, 2024 - NCDOT is currently still reviewing the 100% design resubmittal. The documents must be reviewed and approved by NCDOT to obtain construction authorization. Once the documents are approved, the project will enter the bid phase (expected to begin in spring 2024). Construction is currently scheduled to begin later this year.