Description
The scope of this project is to replace air handler units (AHU) 6 and 9 with new AHUs. New controls, ductwork, associated variable air volume systems (VAV), and piping will be installed as part of a complete unit replacement. Each AHU replacement will require a detailed construction phasing process to ensure limited system downtime. Temporary AHUs will be installed as needed during the equipment replacement.
Pre-Bid and Site Tour Details
Pre-Bid Meeting and Site Tour No. 1 Date: April 4, 2025 at 9:30 a.m. ET (Site Tour to immediately follow conclusion of Pre-Bid Meeting)
Site Tour No. 2 Date: April 16, 2025 at 10:00 a.m. ET
Location: CLT Center, 5601 Wilkinson Blvd., Charlotte, NC 28208
Instructions: Bidder attendance to at least one Site Tour is mandatory to be considered for award
Bid Opening Instructions
Date: May 7, 2025 at 2:00 p.m. ET
Location: Microsoft Teams (see link in ITB)
Attachments
(PDF, 2MB) AVIA ITB 25-33 Replacement of Air Handling Units 6 and 49
AVIA ITB 25-33 Addendum No. 3 Re-Advertisement(PDF, 237KB)
AVIA ITB 25-33 Bid Tabulation(PDF, 184KB)
All ITB activity to take place through the e-Builder portal (see under "Related Information" on right-side for link)