Description
The West Boulevard Project includes the construction of approximately 1.2 miles of the future West Blvd by realigning existing Byrum Drive and existing Piney Top Drive from the intersection of Steele Creek Road and West Blvd to the intersection of West Blvd and Piney Top Drive. The Project includes construction of a new intersection of proposed West Blvd and Byrum Drive and a new intersection of proposed West Blvd and Piney Top Drive. Disciplines will include roadway, hydraulics, erosion control, signals, traffic management, pavement marking, signing, utility design, and utility relocation. Existing portions of West Blvd between Steele Creek Road and Piney Top Drive will be removed as part of a separate project.
Pre-Bid Details
Date: April 8, 2024 at 9:00 a.m. ET
Location: Microsoft Teams (see link in ITB)
Instructions: Non-Mandatory
Bid Opening Instructions
Date: April 30, 2024 at 2:00 p.m. ET
Location: Microsoft Teams (see link in ITB)
Attachments
ITB AVIA 24-36 Relocation of West Boulevard (NC 160)(PDF, 2MB)
ITB AVIA 24-36 Bid Tabulation(PDF, 117KB)
All ITB activity to take place through the e-Builder portal (see under "Related Information" on right-side for link)