Projects

What to Expect During Construction

Construction can be loud, dirty and inconvenient. Crews will reduce disruptions where possible.

  • CLTWater works with municipal partners to minimize impacts (detours, garbage collection, etc) on customers.
  • Pipe is delivered and stored on construction easements and/or the road right-of-way. It is common to see several pipes along the side of a street.
  • Driveway access may be limited at times. If you need assistance, please talk to the contractor or call the project inspector.
  • Customers will be notified in advance of planned service outages. There should be no unplanned outages. Any unplanned outage will be considered an emergency.
  • Several dump trucks will travel along the alignment.
  • Residents will maintain their regular schedule for trash and recycling pick up. The construction inspector will ensure that construction activities do not disrupt trash collection.

 

 

 

Transcript: What to expect during construction

0:11
by the time water splashes onto your
0:13
toothbrush it's been on quite a journey
0:15
Charlotte Mecklenburg residents use more
0:18
than a 100 million gallons of water each
0:20
day
0:21
your water flows through thousands of
0:24
miles of underground pipes every day
0:26
Charlotte water is maintaining existing
0:28
pipes and adding new ones when there's a
0:31
water leak or wastewater spill Charlotte
0:33
water fixes it and that means crews may
0:35
be working in your neighborhood or even
0:37
on your property to make repairs
0:39
Charlotte water must go where the pipe
0:41
is and that's underground sometimes it's
0:44
under the street or even in your yard
0:46
repairs and new construction projects
0:49
require digging up dirt or pavement and
0:51
the process can be dirty disruptive and
0:54
noisy the time it takes to make repairs
0:57
and install new pipes really depends on
0:59
the size of the pipe and the difficulty
1:01
of the repair or installation Charlotte
1:03
water tries to notify people who might
1:06
be affected by construction but just
1:08
know the more urgent the problem the
1:10
less time there may be for notification
1:12
work under a street may require
1:14
temporarily closing the road detouring
1:17
traffic and on street parking may be
1:19
restricted near the construction zone
1:21
some customers in a construction area
1:23
may lose water service for a period of
1:25
time to keep water flowing to customers
1:28
Charlotte water sometimes install is a
1:30
temporary above-ground pipe
1:32
our staff understands that construction
1:35
can be a disruption for traffic for
1:37
school bus stops and for every task at
1:39
your home or business that requires
1:41
water our goal is to fix the problem
1:43
quickly and completely
1:45
after pipe work is finished Charlotte
1:48
water will restore the area that
1:50
includes repaving the street and
1:51
sidewalks and replanting grass and yards
1:54
fire hydrants may be flushed to test
1:57
water quality when the work is finished
1:59
water from your faucet may be discolored
2:01
or cloudy run your cold water for 15
2:03
minutes if the water still doesn't look
2:05
right call 3-1-1 to reach a dispatcher
2:09
construction projects and repairs can be
2:11
unpredictable messy and an inconvenience
2:14
we appreciate your patience and
2:16
cooperation as Charlotte water continues
2:19
to provide clean safe drinking water and
2:21
wastewater service
2:23
[Music]