Lorna/Laburnum Storm Drainage Improvement Project

  • Project typeStorm Water Services
Overview

The Lorna/Laburnum Storm Drainage Improvement Project will reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 50 acres, the project will replace and/or rehabilitate aging infrastructure and provide adequate drainage system capacity. The project area is bordered by Bascom Street to the north, Briar Creek to the south, Bay Street and Laburnum Avenue to the east and Kingsbury Drive to the west.

Project Updates

November 2023

Charlotte-Mecklenburg Storm Water Services and engineering consultant The Isaacs Group continue to study the existing storm drainage system in the Lorna/Laburnum project area. Once the study is complete, several alternative solutions will be developed.

Please note project manager contact information has been updated below.

         

Estimated Cost: To Be Determined*

*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.


Project Phase: Planning

Learn more about project phases.