The Fielding Storm Drainage Improvement Project may reduce street and structure flooding throughout the neighborhood. Located within a drainage area of approximately 72 acres, the project may replace aging infrastructure and provide adequate system capacity.
The project area is bordered by Rutledge Road to the north, Cavendish Court to the south, Providence Road to the west and Fielding Avenue to the east.
Staff continue to study the existing storm drainage system in the Fielding project area. View the September mailer(PDF, 657KB) for more information.
*includes all costs associated with this project such as planning and design, utility relocation, consultant fees, permits, construction, and landscaping.
Learn more about project phases.
Storm Water Services
Jackie Deal, PE Senior Project Manager 704.301.8147 Jackie.Deal@charlottenc.gov
Doug Lozner, PE Engineering Program Manager 704.432.0964 Doug.Lozner@charlottenc.gov